Description
When might this area be repaved due to some time ago there was a water main break at location where it lifted the driveway and street and possibly compromised the asphalt. Within last 6 to 12 month period extensive alligator cracks have appeared and center of road appears more elevated than normal a separate report was sent to pavement about a possible repair but when could the street be repaved?
2 Commentaires
Reconnu CSR3 (Membre officiel vérifié)
Clos MGeble (Membre officiel vérifié)