The sidewalk at Calumet Parkway and Stony Oak Drive is incomplete. Why the city/county allowed a developer to not complete the sidewalk is a mystery. There is about 35 feet of grass between two sidewalks. The sidewalk needs to be installed or a ADA curb cutout completed at the end of the existing sidewalk.
11 Comments
Newnan, Georgia (Registered User)
rwhatzo (Registered User)
Newnan, Georgia (Registered User)
Acknowledged City Engineer (Registered User)
Thanks for reporting.
"Back in the day", a developer was required to build sidewalk with each lot. This particular lot is associated with HOA property, not a house.
Today, we require a developer to build sidewalk on open space prior to street acceptance, to avoid this specific issue. We still have a few similar places around Newman.
We will schedule sidewalk construction for this location.
rwhatzo (Registered User)
rwhatzo (Registered User)
rwhatzo (Registered User)
City Engineer (Registered User)
rwhatzo (Registered User)
rwhatzo (Registered User)
Closed Newnan GIS (Registered User)